Mun III Rescue Vehicle Interstage Fairing (Archive) 

^^ Craft Information - Initial Orbital Data ^^

Left in a highly-eccentric orbit, this piece of interstage fairing was originally meant to gradually return and be destroyed after multiple pass through Kerbin's upper atmosphere. However improper calculations in the burn that took the Mun III Rescue Vehicle off to Mun left this pieces's periapsis outside of the atmosphere

Created: 3/4/15 @ 13:17:41 UTC
Avg Velocity: 1.809km/s
Periapsis: 107.198km
Apoapsis: 1,671.513km
Eccentricity: 0.525165
Inclination: 1.188°
Orbital Period: 6,077.04s
Resources: None
Last Update: 3/4/15 @ 14:23 UTC
 Mission Report  
 
KSA Home Page | Flight Tracker Source on Github

Active Vessels

    1. HXF-644 (Class-C)
    2. BCF-204 (Class-E)
      1. ComSat Mun I
      2. ComSat Mun II
      3. ComSat Mun III
      4. Mun III Heat Shield
      5. Munar Orbiter III
      6. Mun III Derelict
      7. Mu-SCAN
      1. ComSat Minmus I Transfer Stage
      2. ComSat Minmus I
      3. ComSat Minmus II
      4. ComSat Minmus III
      5. Mi-SCAN
      6. ComSat Minmus III Transfer Stage
      7. Mi-SCAN Transfer Stage
    1. ComSat Link-1
    2. Mun III Rescue Vehicle Interstage Fairing
    3. Mun III Rescue Vehicle Interstage Fairing
    4. Mun III Rescue Vehicle Transfer Stage
    5. IP ComSat I
    6. IP ComSat II
    7. IP ComSat II Transfer Stage
    8. IP LinkSat
    9. KWO-1
    10. KWO-2
    11. LKO ComSat I
    12. LKO ComSat II
    13. LKO ComSat III
    14. Meeny (Class-A)
    15. Mun II Lift Stage
    16. Lupek
    17. Mi-SCAN Lift Stage
    18. Kerman Space Telescope
    19. Docking Test Capsule
    20. KDO MkIII
    1. Duna I
    2. Duna IPLink-1
    3. Phos
Filter By: Debris | Probe | Rover | Lander | Ship | Station | Base | Asteroid | Inactive Vessels

Current Time @ KSC


Next Launch
None Scheduled
Next Maneuver
None Scheduled